The Maldives China-Malaysia Friendship Bridge is 2,000 meters long and 1,390 meters across the sea, of which the main bridge is 760 meters long. The main bridge is a six-span composite hybrid beam V-type rigid frame bridge. There are 6 closing sections in the whole bridge, which are divided into 3 closing sections of concrete beams and 3 closing sections of steel box beams.
Shandong Tongyao Heavy Industry Technology Co., Ltd. provided 8 sets of continuous beam Form Traveller Formwork system, V-shaped steel Molds and more than 1000 tons of precast girder formworks for the main pier project, which laid a solid foundation for the successful opening of the project.