Balanced cantilever Form traveller construction method in Laos PakbengThe Mekong River Bridge Project

3(1)

Balanced cantilever Form traveller construction method in Laos PakbengThe Mekong River Bridge Project

2023-10-19

BACKGROUND OF PROJECT 

The total length of the bridge is 700m, road length is 321m, can  pass vessel displacement300tons under the bridge. The  construction period is 3 years. After the project finished, It will  greatly enhance the development of regional trade, traffic,  transport and logistics. Meanwhile, it as a part of Asia Highway  Network, it will play an important role in prompting Laos, China and Thai’s trade and logistic. So the bridge was named “LaosChina Friendship Bridge” By Laos.


image


image


image

Share To