Constructed by: CCCC First Harbor Engineering Co., Ltd
Specifications: Total length of this part is 76.937km.There are 36 bridges need to build.Most of the project is in desert, so all the work goes with short timeline,high pressure,lack of water and power.Based on all these, the key work of the project is to ensure the quality of subgrade and concrete.
Product Used: Formtraveler