Constructed by: Henan Province Construction Group Co., Ltd.
Specifications: According to the plan,41 bridges need to be built on South-to-North Water Diversion project in Zhengzhou City. 13 of them were being contracted to build by Zhengzhou Construction Committee.It is from Zhongzhou Avenue in the east to Baisong Road in the west, making a whole length of 23.6km.Estimated invested budget is 1.4 billion yuan.
Product Used: Formtraveler
Solution: 45+70+45 continuous beam,Length of #0 segment:12m, Longest segment:3.5m, heaviest concrete weight:221T,Formtraveler components connected with pin shafts,diameter of pin shaft is 80mm.