BACKGROUND OF PROJECT
25.3km Foshan Urban Rail Transit line2 project with the total length od 32.41km, elevated length 6.4km, underground length6.4km, with 17stations. The investment is about 700million dollars. CCCC First Harbor Engineering Company take the construction of this project. STHC Supplied Formwork design Segment Box Girder Formwork System Site Guidance Formworks Site Guidance& Technical Training