Segment box girder Molds in Foshan Metro Project

3(1)

Segment box girder Molds in Foshan Metro Project

2023-10-19

BACKGROUND OF PROJECT 

25.3km Foshan Urban Rail Transit line2 project with the total length od 32.41km, elevated length 6.4km,  underground length6.4km, with 17stations. The  investment is about 700million dollars. CCCC First Harbor Engineering Company take the  construction of this project. STHC Supplied  Formwork design Segment Box Girder Formwork System  Site Guidance Formworks Site Guidance& Technical Training