The Form Traveller System Is Acclaimed For Enhancing The Cost-Effectiveness Of Bridge Projects Worldwide. The System Is Lightweight, Versatile, Easy To Assemble And Operate, Rolling Forward On Rails, The System Can Be Reset Quickly And Easily.
60+100+60m continuous beam,0#segment length:14m, longest segment:4m,Heaviest segment concrete weight:159.6T
Cantilever Forming Traveler Cantilever Construction-form Traveler Cast-in-place Segment Bridge Construction
30.251+3*52+31.753m continuous beam.Use seven continuous beams to construct together side by side over multiple railway lines, setting up insulating panels at the bottom.Length of #0 segment:12m, the heaviest segment concrete weight:157T.
Road and bridge construction load bearing strength lifting in precast cantilever forming formwork